国产一区二区三区一级av在线观看|欧美性大片xxxxx久久久|扒开老师大腿猛进aaa片|欧美成人一区二区在线观看

Gas pipeline requirements for gas generator sets

Release time:2023-05-23 Publisher:ZHONGTUO
Gas pipelines should be made of steel pipes, and the pipe wall should not be too thin. The joints should be sealed reliably. After the gas pipeline connection is completed, use a gas detector or soapy water to detect pipeline leakage, especially at the joints of flanges, valves, etc.
 
The valve should be inspected regularly to ensure there is no gas leakage, damage or other phenomena. There should be no accumulation around the valve that hinders its operation. The valve should be regularly opened and closed for maintenance. Valves that cannot be opened or closed tightly should be repaired or replaced in a timely manner.
 
The rubber hoses on the gas pipeline should be replaced regularly, and it is strictly prohibited to use expired and aged rubber hoses.
 
When operating, maintaining, and repairing the unit and gas pipeline, it is necessary to reliably cut off the gas source and exhaust the internal gas. Before identifying the cause of the accident and taking necessary safety measures, gas supply to the gas facilities cannot be restored. When carrying out maintenance and repair, explosion-proof measures should be taken or explosion-proof tools should be used. It is strictly prohibited to use tools such as iron tools for knocking operations.
 
The emergency repair of gas leaks should be carried out after cutting off the gas source. When the leak has already burned, measures should be taken to control the fire before cutting off the gas source. Negative pressure is strictly prohibited in the pipeline.
 
Requirements for pre start-up inspection of gas generator sets
Before driving, the following checks must be carried out item by item and confirmed to be correct before driving is allowed.
 
Gas pipeline system
 
The sealing gasket must be installed at the interface between the gas source pipeline and the gas engine inlet to ensure reliable fastening, and the emergency manual shutdown valve function should be reliable.
 
The threaded connection of the gas pipeline must be wrapped with sealing tape, and the welding area must not have air holes.
 
Check if there is any air leakage in the pipeline in the computer room. If there is any leakage, it must be dealt with before starting the machine.
 
Installation of gas components
 
The radial clearance between the mixer flange and the butterfly valve journal must not leak.
 
The connection of solenoid valves and pressure regulating valves should not be loose or leak air.
 
The fusible and explosive diaphragms of each explosion-proof device must be installed in accordance with the technical design requirements, and materials cannot be changed or thickened arbitrarily.
 
The connection between the generator, control panel, and cable connector must be tight and reliable.
 
Sensor and control screen combination simulation detection

,燃?xì)獍l(fā)電機(jī)組
Oil pressure detection: For the prime mover equipped with a pressure relay, use a pressure calibrator to detect the set value and check whether the control screen is open and shut down. The prime mover equipped with a monitor first performs a self check, and then removes the signal input line to check whether the control screen is open and shut down.
 
Oil temperature and water temperature detection: Connect the simulated detected sensor to the sensor wire, place the sensor on the exhaust pipe for heating, and detect whether it is shut down at the set value.
 
Check if the emergency valve and solenoid valve of the air source are reliable.
 
Reduce the load, close the breaker switch, set the speed switch to the rated speed position, then adjust the rated speed potentiometer of the 2301A speed controller, slowly rotate clockwise until the unit is at the set value for alarm opening and overspeed shutdown, and then reset the rated speed potentiometer counterclockwise to the original position.
 
crew
 
Before starting the machine, debris (such as turning bars, tools, screws, etc.) placed on the unit (especially rotating parts) should be removed to prevent workpieces from flying out and injuring people during driving.
 
When manually turning the machine before starting, be sure to disconnect the starting power first to avoid accidentally touching the start button and causing the turning lever to fly out and injure people.
 
Operating Requirements for Gas Generator Units
When starting, first step on the foot switch, press the start button, empty the gas in the cylinder, and then open the gas valve. It is strictly prohibited to supply gas before pressing the start button. If the start is unsuccessful or if the engine shuts down after starting, the gas valve should be immediately closed, the cause should be investigated, and the mixed gas in the cylinder should be discharged before restarting according to the prescribed procedure. After successful startup, the foot switch should be kicked off immediately.
 
When starting the machine, open the doors and windows, activate the exhaust device, and wait until the machine stops.
 
When operating in the computer room, operators should wear safety helmets or helmets. During machine operation, they should not directly face the explosion-proof door, avoid high-speed rotating parts such as flywheels, and should not touch high-temperature parts such as exhaust pipes.
 
During operation, if any gas leakage is found, the operator should immediately unload the load and stop the machine for inspection.
When the unit is running, pay attention to the explosion-proof safety door of the gas engine. Once the explosion occurs (with a loud sound), the gas source should be immediately turned off, and the explosion-proof rubber should be replaced before restarting.
 
Safety measures to be taken for unit shutdown
During normal shutdown, the unit should be allowed to idle until the water temperature and oil temperature drop below 60 ℃ before cutting off the air source and shutting down.
After emergency shutdown, immediately "turn the engine and pump oil" until the water temperature and oil temperature drop below 60 ℃, and then cut off the air source and shut down.
After shutdown, the "solenoid valve power" switch should be placed in the "OFF" position and the main gas valve should be closed.
This article is dedicated to the friendship of gas generator units. For more relevant knowledge, please click on: http://naijame.com Sincere attitude. We will provide you with comprehensive services. We will gradually contribute more relevant knowledge to everyone. Stay tuned

Service

classification

product

recommendation

Contact

Information
  • Tel:0531-69953988
    13012995645
  • Add:101, Building 5, Liandong U Valley Science and Technology Innovation Center, Zhangjin Comprehensive Bonded Zone, No. 33688 Jingshi East Road, Suncun Street, Jinan Area, China (Shandong) Pilot Free Trade Zone

截屏,微信識(shí)別二維碼

  • 国产一区二区三区一级av在线观看|欧美性大片xxxxx久久久|扒开老师大腿猛进aaa片|欧美成人一区二区在线观看
    人妻一区二区视频| 久久婷婷亚洲| 内射免费观看| 欧美激情精品久久| 亚洲欧美精品自偷自拍另| 欧美人与性牲禽猛交69下载| 精品亚洲国产成av人片传媒| 丰满熟妇视频| 国产成人精品一区| 在线观看欧美一区二区| 国产日产欧美精品一区二区三区| 日韩av在线网| 亚洲精品沙发午睡系列| 国产又粗又爽又黄的视频| 高潮熟妇| 最新中文字幕在线播放| 日韩中文字幕二区| gogogo视频免费观看大全| 久久久久久久久久综合| 少妇三区| 精品久久久久久中文幕人妻| 精品一区二区三区精华液| 爽日本japanese丰满多毛| 69视频在线观看| 色乱码一区二区三区在| 天天躁日日躁狠狠躁喷水| 国产午夜精品一区二区三区最新电影| 日韩激情网| 图片区小说区偷拍区| 亚洲精品mv在线观看| 久久久久亚洲av手机播放| 亚洲欧美日韩久久精品| 日本大乳ⅹ久久| 久久婷婷色综合| 性欧美XXXX| 成人福利视频网| 河南妇女毛浓浓BW| 成人高潮aa毛片免费下载| 91av麻豆| 成人黄色av网址| 狠狠躁日日躁夜夜躁老司机|